PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Erecting stone panels at the North Elevation.jpg Block work at Corridor 149 Facing South-East.jpg Curtain wall mullions at 2nd floor South Elevation.jpg Installing copper piping at the 3rd floor Facing East.jpg Installing junction boxes outside Stair -4 Facing East.jpg Installing waste and vent piping at the 3rd floor Facing South.jpg
Previous pageNext page Block work at Corridor 149 Facing South-East
Block work at Corridor 149 Facing South-East